Job Name: Salinity Management Pipeline, Phase 1e
Client: Calleguas Municipal Water District
Project Value: $23.8 million
Completion Date: July 2012
Description of work: The project includes installation of 10,784’ of 48” welded steel pipe, 894’ of 12” welded steel pipe, installation of 766’ of 62” diameter and 84’ of 30” diameter steel casing by trenchless installation methods, 97’ of 62” diameter steel casing by open cut, a flow control station, a meter station, and by-pass piping